What's going on these days...

Posted: Saturday, May 14, 2011 by R and J in
0

R is currently working on building two slide-out shelving units for the big white closet (cave) in the upper bathroom. The room is coming along nicely with the new shower installed and all the walls fixed and painted bright white. It's clean and bright in there finally! The wall-mount toilet was replaced last year due to a crack R found in the old one when he was preparing it to be reinstalled after the bracing was fixed. The new one sounds like it has a jet engine in it when it flushes and it's funny to see how guests react the first time they use it. The baseboards still need to go in and the sink, counter, and cabinets still need to be done, so there's a makeshift counter with the nasty old sink in there for now.

The shelving units will pull out from inside the closet for easy access and will have mirrors on the outside when they're finished. R has created a fantastic design that is going to be beautiful and functional.

Our new woodshed!

Posted: Monday, October 25, 2010 by R and J in Labels:
0

Video one of the woodshed:



And the finished woodshed:




Tomorrow we get our fireplace inspected. Hopefully we can burn the wood from our new wood shed!!! lol

Downstairs bathroom before

Posted: Monday, June 8, 2009 by R and J in
0

This is the downstairs bathroom as it was when we purchased the house:
My wife is very brave.


Downstairs bathroom after the reno

Posted: by R and J in
1

It's done.

South East Lower Bedroom

Posted: Saturday, March 21, 2009 by R and J in
0

This is the bedroom before:



This is the bedroom after. No baseboards, electical covers, blinds, or closet and entry door yet.


North East Lower Bedroom

Posted: by R and J in
0

This is the bedroom before:



This is the bedroom after. No baseboards, electical covers, blinds, or closet and entry door yet.


The Downstairs Hallway... before and after!

Posted: Friday, March 20, 2009 by R and J in
0

The downstairs hallway.


We still have baseboards and electrical face plates to replace. But the patching, painting, and carpet are done!!



Before:



After: